Automation for manufacturing
Automation for businesses that make things rather than only resell them
You know what you hold, what you ordered and what you can promise
In manufacturing a wrong stock figure does not cost one order. It costs a stopped production day and a customer who gets a new date.
What matters here
Materials do not run out by surprise
Production consumption reduces stock in real time, and the order goes out before a line stalls.
Promised dates are real
What you can promise is calculated from stock, orders in progress and supplier lead times, not from optimism.
Paperwork follows the goods
Delivery notes, invoices and receipts tie back to their order, without somebody matching them at month end.
The real cost per product
You see what actually went into a product, at the prices of the time, not an outdated average.
Where we start
What that looks like
The first of the flows above, step by step. The rest follow the same pattern.
1. Goods in
Receipt is confirmed against the order. What arrived enters stock, and discrepancies are flagged on the spot.
- n8n
- OCR
2. Goods out
Consumption is deducted automatically from sales, orders or recipes, depending on what you sell.
- PostgreSQL
3. Thresholds
The alert threshold recalculates from recent weeks' consumption and the supplier's lead time.
- PostgreSQL
4. The alert
The warning reaches whoever orders, on the channel they actually read, with a suggested quantity already worked out.
- WhatsApp Business API
- Slack
5. Reconciliation
At stocktake, differences between recorded and actual are logged with a reason, so patterns become visible.
Results
A 70-employee catering group with two event venues
Event production, stock and invoicing came into one system, live in six weeks.
Frequently asked questions
- We already have an ERP. What is left to do?
- Usually the edges: what happens in spreadsheets alongside the ERP, what gets retyped between systems, what never enters it at all.
- We make to order, not in series.
- All the more reason the date and true-cost calculations matter — made to order, every wrong estimate is a wrong promise.
- Do you connect to machinery?
- Only where they expose data through an accessible interface. Industrial control itself is not our field and we say so plainly.
- Where do we start?
- With the materials that last stopped your production. There are few, they are easy to measure, and the result shows in the first month.
- How long until we see something?
- The first flow live in two to three weeks. A full picture of cost per product takes longer, because it needs clean data.